Skip to content

Shingles

Shingles is a disease that causes a painful, itchy rash. While this rash can appear any where on the body, it is typically confined to only one side of the body. Shingles is caused by the chickenpox virus, which “reactivates” to cause the disease.You cannot get shingles unless you have had chickenpox.

Early symptoms may include flu-like symptoms, headaches and light sensitivity. Itching, tingling and pain may occur before a rash appears. Early treatment is vital to reduce pain and complications associated with shingles, so see a doctor as soon as possible if you have these symptoms and you have had chicken pox. Those at higher risk for developing shingles are those over age 50, those with weakened immune systems, or those who have cancer or are receiving treatment for cancer.

Getting the shingles vaccine does not entirely negate the chance of getting shingles, but it does help in reducing the severity of the outbreak, as well as the potential of post herpetic pain.

Read more about Shingles in our article, “Shingles 101: Are you at risk?

Raleigh Adult Medicine, P.A.  |   3200 Blue Ridge Road Suite 210, Raleigh, NC 27612  |  office: 919.781.9979  |  fax: 919.781.0124
Monday through Thursday: 8 a.m. – 5 p.m.  |   Friday: 8 a.m. – 1 p.m.  |  Saturday Sick Clinic (by appointment only): 8 a.m. – 12 p.m.

The contents of Raleighadultmedicine.com site, such as text, graphics, images, and other material contained on the Raleighadultmedicine.com Site (“Content”) are for informational purposes only. The Content is not intended to be a substitute for professional medical advice, diagnosis, or treatment. Always seek the advice of your physician or other qualified health provider with any questions you may have regarding a medical condition. Never disregard professional medical advice or delay in seeking it because of something you have read on the Raleighadultmedicine.com Site!

BLUE RIDGE ROAD CONSTRUCTION PROJECT: The City of Raleigh began a construction project in June to widen Blue Ridge Road. Most of the erosion control and tree protection is now in place, and clearing crews are working on tree and brush removal. During this work, there may be lane closures and traffic delays. Please allow yourself extra time to ensure you are on time for your appointment!  All construction updates can be accessed via "Blue Ridge Road Widening Project."